Tukafoolad Investment Company
  Home
 Portal
 About Tuka
 Activities
  Chart
 Tuka Group
 Magazin
 Gallery
 E-mail
 Contact

Tuka Is Involved Mainly In Two Activities

 

 Investment

Tuka has established more than 20 firms involving in various fields mainly serving steel industries.

Tuka Foolad Co. has invested in different fields related to steel industries. The number of established and well-operated companies is more than 20 firms. Among diversified activities, we offer through our sister companies:

Consulting Engineering & Design, Plant  Installation and Commissioning.

Plant Maintenance, Technical Survey, Operation and Management of Production lines, Commercial and Procurement Services, Local and International, Production of rubber parts and components, Production of Refractory, Refractory laying and installation services, Transportation Services (Road and Rail), Steel Service Center (Cut to size and slitting of Steel coil and sheet), Galvanized Steel Production, Production of Steel Profiles, Insurance and Equity Business.

 Execution of large projects

Tuka is involved in execution of Turnkey projects, maintenance projects, operation of production lines and procurement of equipments, erection and commissioning of industrial projects.

Tuka Foolad with its Matrix organization chart has the essential flexibility in mobilizing the suitable and qualified personnel and at time that has sensed it’s presence is imperative in a certain field, has commenced an active participating role among its affiliates and within new projects in a shortest time by means of providing the required capital investment, equipments, machineries and useful human resources.

Tuka Foolad has a very valuable experience in large Turnkey, commissioning, erection and repair projects, also supervision and operation of production lines. Moreover, active in B.O.T. projects and is a service provider and supplier of human resources.

2of the most important projects in hand are;

-         Car-damper for MSC Co.

-         Car-damper for Saba project

At this moment the capital invested in these two above mentioned projects is about 200million dollars.

These equipments have the responsibility of unloading the wagons carrying Iron ore and transfer them to the storage of raw-material area

 
Pr     /     En  
   
     
Copyright By Tukafoolad Investment Company 2009 - 2010